A reservoir plan, well program, surface design and economic model can each be technically sound yet still disagree. The 7+1 approach treats those interfaces as the core of the decision.

Practical takeaways
  1. Start with one shared production and uncertainty basis.
  2. Reconcile surface capacity with the well and reservoir schedule.
  3. Evaluate safety, environment and energy before options are frozen.
  4. Run economics on the integrated concept—not on disconnected estimates.